PROFESSIONAL EXPERIENCE
WFI:
Construction Manager AT&T (9-2013- 12-2013)
Over see the construction for the Civil and Tower of
LTE project.
Red Line documents, Oversee the day to day build of
the sites.
Amerit:
Construction Manager T-Mobile. (4-2013- 9-2013)
Oversee the General Contractor on the construction
of the civil and tower of sites, doing the paper work from start to finish of
each site. Daily conference calls. Site walk with the GC, working
hand in hand with GC to see that the sites are built on time and quality from
the start.
Mycom Roswell Ga. (5/2012-4-2013)
Field manager over see the build of the head end for
DAS, Civil crew’s construction the Sprint Samsung site. Over see the
civil crew’s construction of the T-Mobile Nokia Equipment sites.
ERICSSON, Plano
TX
Engineer Technician I / HS1 (2011-2012)
Associate Engineer (2011)
Responsible for Installing, Testing and Integrating
Ericsson equipment for Metro PCS on projects in Southeastern Michigan.
Coordinated day to day alarm resolution assignments of 4 technicians. Promoted
to Engineer Technician I after 4 months with the company.
Supported Verizon’s expansion of service across the
US. Directly employed by several contract firms between 2007 - 2011
ZERO
CHAOS 2010-2011
Builder
3/ Associate Engineer
Team
leader for the installation of primarily Nortel equipment for Verizon to over
300 new cell towers throughout Ohio. Installed new BTS frames; ran and
terminated power; installed GPS; ran T-1 cables to MIS frame; wire wrapped to
T-1 pins; ran alarm cable to 66 blocks and punched it down; installed PDFB
and battery backup.
GLOW
NETWORKS Plano Tx.
2009-2010
Builder
3/ Associate Engineer
Team
leader for the installation of Verizon equipment to over 100 new cell towers
throughout Ohio. Installed new BTS frames; ran and terminated power;
installed GPS; ran T-1 cables to MIS frame; wire wrapped to T-1 pins; ran
alarm cable to 66 blocks and punched it down; installed PDFB and battery
backup.
ZERO
CHAOS 2007-
2009
Builder
3
Installed
of Verizon equipment for new cell towers throughout Ohio. Installed new BTS
frames; ran and terminated power; installed GPS; ran T-1 cables to MIS frame;
wire wrapped to T-1 pins; ran alarm cable to 66 blocks and punched it down;
installed PDFB and battery backup.
COMFORCE 2004-2006
Builder 3
Install the new Nortel Succession IP, GNS, and ATM Switch. Put
up Ox bar, installed cable rack, marked floor to drill holes for frame,
anchor frames, ran power termite power, ran cat-5 cables to equipment, ran 25
pr. cables to main frame blocks. Ran Fiber from fiber equipment to fiber
Frame. Laced all cables to rack.
AJILON 2003-2004
Lead
Installer
Worked Time and Expense for Verizon. Able to do MOP, EOJ, Gen Check
list, Fiber check list, Check Bar coding, High Risk, Acceptance report, Flash
Report, Engfac report, Alarm snap shot, Install equipment with little to no
supervision. Installed Cenna Fiber frames. Ran fiber from Cenna equipment to
Fiber patch panels. Optera 3500 Fiber frame, Ran fiber to Patch panels.
INSTALLER COMFORCE 2002-2003
Builder
3
DMS 100, DMS 250, DMS 500 Northern Telecom wireless equipment.
TAD TELECOM 2000-2002
Lead Installer:
Oversaw installers and made sure the
equipment was Installed properly. Also assisted in the installation of
equipment. Bar coding and labeling per Verizon spec.
US COMM 1999-2000
Builder
Installed Nortel Telecommunications DMS 500. Installed cable racks Newton
MDF, frames, DSX 1 and SX 3 panels, fuse panels and power.
CERTIFICATIONS
Certified in Building of all
Nortel/Ericsson equipment and Programming of BTS, DBU, CDMA equipment,
UMTS/WCDMA 3206, RBS 6601, RBS 6201, LTE Equipment, Smart Laptop.
TECHNICAL ADDENDUM
Alcatel